Sign In | Join Free | My ccnmag.com |
|
Brand Name : Kingrui
Model Number : KR091201
Certification : ISO9001: 2008
Place of Origin : Dongguan, China( Mainland)
MOQ : 1 Pcs
Price : Negotiable
Payment Terms : T/T 50% as deposit 50% before shipment
Supply Ability : 1200-1500 units per month
Delivery Time : Normally, simple parts,5- 7 workdays, complicated parts 7- 15 workdays, according QTY and the complexity of drawing.
Packaging Details : PE film covered first, Plastic box, then carton last.
Com[oment Name : Custom Injection Mould Precision Cnc Custom Machining With EDM Processing
Shaping Mode : Plastic injection Mould
Material Used : SKD61 or customized is welcomed
Accuracy for Grinding : 0.001 mm
Surface Roughness : Ra 0.4 um
Accuracy for EDM : 0.002 mm
Cnc machining or not : CNC Machining
Size : According to customer's requirement
Custom Injection Mould Precision Cnc Custom Machining With EDM Processing
Specification of us
We specialize in non- standard mold parts, precision mold parts, covering turning, milling, wire EDM cutting,EDM, grinding, etc. with more than 15 years experience .Please send us drawings or samples with details technical requirement. We can process mold parts for customers base on provided drawings.
Main products | CNC milling parts, CNC turning parts, grinding parts, wire EDM cutting parts,precision mold parts ,EDM spare parts, wire EDM parts, injection mold parts, core pins and sleeves, and industrial cutting toolsetc. |
Material available | steel, aluminum, brass, iron, zinc, copper, HSS, SS, etc. |
Process | turning, milling, wire EDM, grinding, EDM, internal - external lapping, CNC milling, etc. |
Tolerance | +/- 0.005 mm or customized according to customer's requirements |
Certification | ISO9001: 2008 |
Production capacity | 1200- 1500pcs ,it depends on complexity of different products |
| Precision mold parts machining manufacture from 2005, |
Cooperative partners | Sumitomo (Japan ) |
| - internal packaging: PP bag, plastic bag, etc |
Lead time | Usually 5- 7 working days (mainly depends on different quantity ) |
Term of Payment | T/T, 50% as deposit 50% before shipment |
Packaging & Delivery
Packaging Details
1. With Antirust oil and PE film, the rust prevention during transport.
2. To be packed in plastic and cartons. Prevent vibration and slide.
3. Use glues tape to seal cartons.
4. Deliver out by DHL,FEDEX Or according to customers' requirement.
Delivery Time
Shipped in 5-7 working days after payment
WHY US?
![]() |
EDM Accuracy 0.002mm SKD61 CNC Machined Components Images |